 |
The footing is completely exposed, and after determining final grade the plaster is cut at that level. |
 |
The damaged stone or adobe footing is repaired and a mud leveling coat applied. |
 |
MiraDRAIN 6000® or equivalent "geodrain" is inserted in a continuously-slotted pipe that runs to daylight, a drywell or an infiltration gallery. |
 |
The geodrain empties to daylight or into a subsurface infiltration gallery. |
|
The geodrain is affixed to the wall under a plaster stop. |
|
The surface is graded away from the plaster stop. |